Ultratec TDD Detector Especificações Página 21

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 24
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 20
7. Press the Send (Red) Button and the Send LED will turn on. You
have now tested the rack for correct wiring of the power supply and
Auto/Manual mode selection.
8. Disconnect the power supply from the 115VAC source.
9. Connect the telephone lines to the 2 Micro-ribbon Male connectors
as indicated in the schematic diagram at the back of this manual
which shows the connectors on the back of the TDD Detector Rack
Enclosure.
Manual Connection - Connect only Tip# and Ring#. No other
connections are necessary.
Automatic Switch Connection - Connect the Tip#, Ring#, OH# and
the Ground as indicated on the diagram. TipL# and RingL# are not
to be connected. The OH# and its GND connection are the
connections to the open switch element indicating when the
telephone line is Off/On hook. These connections should go only to
the switch element. The OH# connection is internally biased on the
TDD Detector card so no outside power connections are required.
Automatic Loop Current Detection - In this mode the TDD
Detector card is placed in series ahead of the operator so that loop
current detection is accomplished. This requires 4 telephone line
connections to be made. Connect Tip# and Ring# as indicated. The
connections to the operator's equipment then come from the TipL#
and RingL# connections as shown on the diagram. Jumper J3 on the
TDD Detector card must be changed to the top position.
Note: The TDD Detector cards do not draw loop current. Therefore
loop current must be drawn by the operator's equipment for this
feature to operate (10mA. min).
10. Plug the 2 Micro-ribbon connectors into the back of TDD Detector
Rack Enclosure. Please note that Connector #1 is for lines 1-7 and
Connector #2 is for lines 8-15. Re-connect the 115 VAC power source
to the 12VDC power supply and press the Reset (Black) button on
Card #1 in the TDD Detector Rack Enclosure.
11. Perform the TDD Detector Installation Test (see below) for Card #1.
12. Disconnect the 115 VAC power source. Install the remaining TDD
Detector cards in the TDD Detector Rack Enclosure. Reinstall the
restraining bar using the 2 wing screws provided.
13. Re-connect the 115 VAC power source and press the Reset (Black)
button on each TDD Detector card. Test each line using the TDD
Detector Installation Test procedure given below.
Vista de página 20
1 2 ... 16 17 18 19 20 21 22 23 24

Comentários a estes Manuais

Sem comentários